DD-4 Startup and Training Program


The enclosure is typically shipped to the job site and installed by the customer with the required conduit and alarm circuits as described below. The startup personnel will generally bring the DD-4 system at the time of startup.

Complete installation is available at additional cost, if desired by the customer

Items covered in startup and training:

  1. Transportation, food, and lodging for startup personnel to and from startup location and during training are included in startup price.
  2. Customer furnishes previously run and previously identified and marked alarm wire pairs for each trip circuit being monitored. Wires should be run inside conduit from alarm location to inside DD-4 enclosure. Wires should be four feet long inside DD-4 enclosure. Wire size preferred 18 to 22 gauge twisted wire pair. The length of run would determine the wire size selected.
  3. Startup personnel will make the physical connections of the alarm pairs to the appropriate DD-4 terminal block, in addition to setup and checkout of the DD-4 system.
  4. Training of the customer in the operation and proper use of the DD-4 system will include:
    a. How to install and change telephone numbers
    b. How to install and change alarm messages
    c. How to setup and operate ID codes
    d. How to access the DD-4 from a remote location
  5. Operational checkout of alarm contacts and the DD-4 system to ensure proper operation will be performed by the startup personnel. The proper operation of the alarm devices and related wiring is the responsibility of the customer.
  6. The physical hookup of the alarm contacts, operational checkout of the system and familiarizing the customer with the operation and capabilities of the DD-4 system generally takes one day.
  7. The customer will make arrangements to have 115 volt A/C duplex receptacle available near the unit. This duplex receptacle should be dedicated for use of the 16.5 volt A/C transformer and should be on a separate breaker. The customer shall arrange for TOUCHTONE telephone service to be activated prior to checkout of the system.