DD-4 Startup and Training Program
The enclosure
is typically shipped to the job site and installed by the
customer with the required conduit and alarm circuits as
described below. The startup personnel will generally bring the
DD-4 system at the time of startup.
Complete
installation is available at additional cost, if desired by the
customer
Items covered
in startup and training:
- Transportation,
food, and lodging for startup personnel to and from
startup location and during training are included in
startup price.
- Customer
furnishes previously run and previously identified and
marked alarm wire pairs for each trip circuit being
monitored. Wires should be run inside conduit from alarm
location to inside DD-4 enclosure. Wires should be four
feet long inside DD-4 enclosure. Wire size preferred 18
to 22 gauge twisted wire pair. The length of run would
determine the wire size selected.
- Startup
personnel will make the physical connections of the alarm
pairs to the appropriate DD-4 terminal block, in addition
to setup and checkout of the DD-4 system.
- Training
of the customer in the operation and proper use of the
DD-4 system will include:
a. How to install and change telephone numbers
b. How to install and change alarm messages
c. How to setup and operate ID codes
d. How to access the DD-4 from a remote location
- Operational
checkout of alarm contacts and the DD-4 system to ensure
proper operation will be performed by the startup
personnel. The proper operation of the alarm devices and
related wiring is the responsibility of the customer.
- The
physical hookup of the alarm contacts, operational
checkout of the system and familiarizing the customer
with the operation and capabilities of the DD-4 system
generally takes one day.
- The
customer will make arrangements to have 115 volt A/C
duplex receptacle available near the unit. This duplex
receptacle should be dedicated for use of the 16.5 volt
A/C transformer and should be on a separate breaker. The
customer shall arrange for TOUCHTONE telephone
service to be activated prior to checkout of the system.